@blird Resource to List, then to Foreach Loop.
Here’s something similar for me, he follows the list of Links and how many of them he will work on:
is there any way to change threads number dynamically?
-
@yuhuan110 said in is there any way to change threads number dynamically?:
My script need to change the threads number dynamically, e.g.: 9:00-10:00 i need 30 threads,10:00-11:00 40 threads ...
What should I do?Dynamically increase the number of threads can not. Specify at once the maximum number of threads, and let the excess threads sleep. Or use the action "Call function in several threads".