@CashOut1337 @Detected
Please describe the problem in more detail. I don't fully understand what you are talking about. How can this be repeated intentionally? What actions should I use? Perhaps you can attach a test project?
Which version of BAS is used in the Scheduler?
-
I have different sripts, built with different versions of BAS. Most of them are added to the BAS stand alone "TaskScheduler".
So I'm wondering what version of BAS they are running on? As when I open an older project in a newer version of BAS it asks me to update all actions in the script automatically.So if I run a project in the TaskScheduler without opening (and updating) it with a newer (or the latest) version of BAS is it then automatically updated or using the engine/BAS version it was built with. And what if the old version used for building is not installed any more?
Thanks for clarification.